Vertigo

Vertigo

  • Snapshot
  • Drilling Highlights
  • Maps

The Vertigo Target is new, road accessible, discovery on the JP Ross property which is comprised of 2,850 quartz claims covering over 57,000 hectares with at least 14 known target areas and numerous placer gold bearing creeks.

To date, at least 12 mineralized structures are recognized on the Vertigo target over a 1500m x 650m area, and consist of W-NW trending, steeply dipping zones of quartz veining, brecciation, and fracture-controlled mineralization with disseminated to vein-controlled pyrite-arsenopyrite-galena and, locally, visible gold mineralization.

Hole ID From(m) To(m) Interval(m) Au(g/t)
JPRVERRC18-010 1.52 4.57 3.05 1.89
And 13.72 16.76 3.05 1.39
JPRVERRC18-014 41.15 42.67 1.52 18.60
JPRVERRC18-016* 54.86 64.01 9.14 9.20
Including 54.86 59.44 4.57 17.20
Including 56.39 57.91 1.52 31.00
JPRVERRC18-017 3.05 4.57 1.52 1.17
And 21.34 24.38 3.05 1.60
JPRVERRC18-020* 0.00 6.10 6.10 0.84
And 82.30 83.82 1.52 0.81

*Hole ends in mineralization.

Hole ID From(m) To(m) Interval(m) Au(g/t) Ag(g/t)
Combined RAB14/RC13 0.00 30.46 30.46 22.47 154.00
JPRVERRAB18-014* 0.00 24.38 24.38 23.44  144.75
 Including 0.00 3.05 3.05 59.30  304.00
 And 12.19 15.24 3.05 39.40  196.00
 And 19.81 24.38 4.57 26.10  243.00
JPRVERRC18-013 24.38 30.46 6.10 18.59 188.80
Including 27.43 28.96 1.52 59.50 439.00
And 44.20 48.77 4.57 6.82  6.80
Including 44.20 45.72 1.52 18.50 12.90

Interpretation of the results is ongoing and there is not currently enough information to estimate true thickness of the mineralized zones.

Hole ID From(m) To(m) Interval(m) Au(g/t)
JPRVERRAB18-016 0.00 3.05 3.05 0.88
And 10.67 12.19 1.52 1.08
And 32.00 47.24 15.24 0.93
Including 33.53 36.58 3.05 2.12
Including 42.67 47.24 4.57 1.10
JPRVERRAB18-017 4.57 6.10 1.53 0.87
And 27.43 36.58 9.15 1.03
Including 27.43 30.48 3.05 2.16
JPRVERRC18-001 39.62 54.86 15.24 1.01
Including 41.15 42.67 1.52 2.56
Including 47.24 48.77 1.53 1.74
Including 53.34 54.86 1.52 2.03
JPRVERRC18-002 62.48 65.53 3.05 0.72
JPRVERRC18-003 19.81 21.34 1.52 30.70
And 65.53 73.15 7.62 3.98
Including 65.53 68.58 3.05 7.14
JPRVERRC18-006 0.00 82.30 82.3 3.21
Including 0.00 6.10 6.10 31.40
Including 0.00 1.52 1.52 103.90
And 13.72 22.86 9.14 2.02
And 36.58 42.67 6.10 4.92
And 70.10 73.15 3.05 2.92
JPRVERRC18-007 10.67 12.19 1.52 6.88
And 30.48 32.00 1.52 9.40
JPRVERRC18-008* 24.38 27.43 3.05 4.00
And 45.72 47.24 1.52 1.25
And 60.96 62.48 1.52 2.20
JPRVERRC18-009 0.00 6.10 6.10 14.23
Including 0.00 3.05 3.05 38.56
And 15.24 18.29 3.05 2.11
And 41.15 45.72 4.57 6.10
Including 41.15 42.67 1.52 14.80

*Hole ended in mineralization.

Section 1
Section 1
Section 1
Section 1

Sign Up for our latest news and updates